A workflow from the decision you own to ongoing review. These steps describe the method; dated product receipts establish what was actually tested, delivered and observed.
01Decide
Your leadership
Decide what stays secret.
Name the long-lived data, the systems that carry it, and the decision your leadership needs. Agree the scope before assessment begins.
Evidence to inspect: Approved scope, accountable owner, review date.
02Find
QScout
Find the exposure.
Define the approved cryptography and crypto-agility assessment. Inspect the collection coverage, credentials required and gaps recorded for the particular engagement.
Evidence to inspect: Asset inventory, CBOM, coverage and named gaps.
Inspect the assessment method03Prove
QStrike
Prove what the evidence supports.
Test a scoped hypothesis in a controlled environment. A dated run record must identify the method, execution environment and result before an execution claim is accepted.
Evidence to inspect: Scoped hypothesis, run identity, result and limitations.
04Protect
QShield by Qtonic Quantum Corp.
Protect what cannot wait.
Evaluate software-based protection for links carrying long-lived data. Check the specific build, tested traffic, recovery behavior and deployment conditions in its receipts.
Evidence to inspect: Build identity, test scope, protection and recovery receipts.
05Fix
QSolve
Sequence the migration.
Turn accepted findings into an owned migration plan: current state, hybrid transition and post-quantum target. Each change needs an exit gate and retest evidence.
Evidence to inspect: Owner, dependency, migration sequence and exit gate.
Inspect the migration sequence06Watch
QScout Pulse
Watch for change.
Define the monitoring scope and review dated observations. Check which channels and collection paths are supported by the current release; bring material changes back into assessment.
Evidence to inspect: Observed change, timestamp, coverage and next review.
Inspect QScout scope
Watch → Find: material changes return to assessment, with a new scope and review date.
Plan the transition. Verify each step.
Current state → hybrid → post-quantum. 2029 is Qtonic Quantum Corp's planning control date, not a prediction of Q-Day or a completion guarantee.
Keep assessment and authorization distinct.
Qtonic Quantum Corp. operates the Qtonic Quantum Lab. Read its published methodology and dated proof for assessment status. QShield by Qtonic Quantum Corp. is not represented as FIPS 140-3 validated or as holding government authorization.
The same published rules apply to company products. Lab policy: no paid inclusion, ranking, or evaluation.